PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct hangers at the Main Lobby Facing North-East (800x600).jpg Installing pour stops at Stair -4 Facing North-East  (800x600).jpg Pouring the concrete slab on grade Facing South (800x600).jpg Pouring the concrete slab on grade Facing South-West (800x600).jpg Duct hangers at the Main Lobby Facing West (800x600).jpg
Next page Installing duct hangers at the Main Lobby Facing North-East (800x600)
Installing duct hangers at the Main Lobby Facing North-East (800x600)